MÔ TẢ CÔNG VIỆC
1 Design: Design Shipper, Packer, Divider, Pad, …
- Get information from final packaging information meeting, estimate package dimension and confirm with Procurement Dept. to identify suitable suppliers;
- Work with suppliers to get the test sample;
- Check sample and modify if needed;
- Send sample, drawings to Japan for approval;
- If drawings approved, send approved drawings to supplier and Product Management team
2 New product control
- Update new information: schedule, size, container method, packaging method, …
- Send this information to related departments
- BOM meeting: Check information in Bill of Material (BOM) with PMC Dept., confirm components, packaging method;
- New Products Sharing information meeting. Define what new products will be made trial/initial in next month;
- Invite related Depts. for meeting; Sharing components feature and packaging method, confirm procedure, confirm blue printing, the other problems related to operation in production
- Confirm standard sample for QA, Production Depts. Receive sample from QA, confirm dimension, assembly and pass to PMC Dept. for standard sample signature.
- Confirm roll direction of new Label (receive information from Procurement Dept.)
- Check items in procedure, such as volume amount, filling amount, open torque, sticking label position, batch code position ...
- Confirm Finished Goods specification created from staff, deliver to related Depts. (Production control and QA Depts)
3 Trial Check design complete
- Make sure all packaging components (Shipper, Packer, Divider, Pad …) are completed before trial;
- Hold a meeting before trial 1 week, confirm components available, QA has inspected, Maintenance Dept. finished tools, announce some note when perform trial
- Follow up trial run, record the problem, give solutions
- Hold a trial run meeting, summarize the problem after trial, give preventive actions;
- Feedback supplier about packaging components problems;
- Perform transportation test, drop test
- Store trial sample and make stability test ( 0, RT, 37, 50 in 1M, 3M, 6M)
4 Testing New components
- Test new material such as change supplier, change material, change dimension, change printing method. Make report and share to Japan factory
5 Support Support Production, QA
- Support QA, production about problem related to packaging components, testing, investigation;
6 Action plan Action plan by quarter
- Create General Process, SOP